Pineda Energy Solutions
C-10 Electrical + B General Contractor · Permitted · Los Angeles

ADU Construction& Remodels in LA

Accessory dwelling units, room additions, garage conversions, and full remodels. We hold both a C-10 Electrical and B General Contractor license — so you get one contractor, one contract, and no coordination headaches between trades.

B General Contractor
C-10 Electrical License
Permits Handled
Both Trades, One Invoice
Scope of Work

What We Build

From a full ADU build to a single-room addition — we handle construction and electrical under one roof.

🏠

ADU New Builds

Detached and attached accessory dwelling units, backyard cottages, and garage conversions. We handle structural framing, electrical rough-in, and finish work.

📐

Room Additions

Expanding your footprint — master bedroom additions, sunrooms, extra baths. We tie into your existing structure and bring the electrical up to code.

🔨

Full Remodels

Kitchen and bathroom remodels, open-concept conversions, and whole-room renovations. Construction and electrical handled under one contract.

🚗

Garage Conversions

Convert an attached or detached garage into livable square footage. One of the most cost-effective ADU paths in Los Angeles.

Why Build an ADU

The Case for Adding a Unit

Los Angeles has made it significantly easier to build ADUs since 2020. Streamlined permitting, reduced fees, and strong rental demand make this one of the highest-return projects a homeowner can do in LA right now.

The dual-license advantage matters here: most ADU projects require both a building permit and an electrical permit. When one company holds both licenses, you skip the coordination delays between separate contractors — one call, one schedule, one invoice.

Rental Income

A permitted ADU can generate $1,500–$3,500/month in Los Angeles. It pays for itself.

Property Value

Adding a permitted ADU increases the appraised value of your property — often more than the cost of construction.

Multi-Generational Living

Keep family close without sharing a front door. ADUs give privacy to both households.

LA's ADU-Friendly Laws

California and Los Angeles have significantly streamlined ADU permitting since 2020. Now is a good time to build.

Our Work

ADU Projects in Los Angeles

Real work from real jobs. Structural framing, electrical rough-in, and finished lighting — all by the same crew.

ADU electrical rough-in with conduit and wiring by Pineda Energy Solutions
Phase 1
Electrical Rough-In
ADU electrical boxes and wiring installed during construction
In Progress
Wiring & Boxes
Finished ADU interior with lighting fixture installed by Pineda Energy Solutions
Complete
Finished & Lit
How It Works

From First Call to Move-In Ready

01

Site Assessment

We walk your property, review setbacks, measure the existing structure, and assess the electrical service to determine what the project needs.

02

Written Scope & Price

You get a clear proposal covering construction, electrical, and permitting costs. No vague estimates.

03

Permits Pulled

We handle the building permit application with the City of Los Angeles or your local jurisdiction. Both trades under one license — no separate electrical permit coordination.

04

Build, Inspect, Done

Construction and electrical work run concurrently. We coordinate all inspections and deliver a finished, permitted, move-in-ready unit.

Building an ADU? Add a Tesla Powerwall or EV Charger

Since we handle the electrical for your ADU, adding a Powerwall, EV charger, or solar-ready panel is straightforward. We can scope it into the same project — no second electrician needed.

FAQ

Common Questions

How much does an ADU cost to build in Los Angeles?

ADU costs vary widely based on size, type (detached vs. attached vs. garage conversion), and finish level. Garage conversions start lower; new detached builds run higher per square foot. We walk every project and give a written price before any work begins.

Do you handle both the construction and electrical for ADUs?

Yes — this is the key advantage of working with us. We hold both a B General Contractor license and a C-10 Electrical Contractor license. Construction and electrical are handled under one contract, one schedule, and one point of contact.

How long does ADU construction take in Los Angeles?

Permit approval typically takes 4–8 weeks depending on project type and the city. Construction time depends on scope — a garage conversion can be done in 6–10 weeks; a new detached ADU may take 3–5 months.

Can I build an ADU in my backyard?

Most single-family lots in Los Angeles can support at least one ADU. Setback requirements, lot size, and existing structures affect what's possible. We assess this on the site visit and tell you exactly what you can build.

What's the difference between a detached ADU and a garage conversion?

A detached ADU is a standalone new structure built in your yard. A garage conversion repurposes your existing garage into livable space. Garage conversions are generally less expensive and faster to permit since the structure already exists.

Will an ADU increase my property taxes?

In California, adding an ADU typically results in a supplemental assessment on the new construction — not a reassessment of your entire property. Your existing home's assessed value stays the same.

Get Started

Get an ADU or Remodel Quote

Tell us what you're building or remodeling. We'll come out, walk the property, and give you a straight written price that covers construction and electrical — no need to hire two contractors. Serving Los Angeles and surrounding areas within 30 miles.

Call us directly

323-217-6960

C-10 Electrical + B General Contractor

Both Trades, One License #1145631

Request a Quote

Call NowGet a Quote